Friday, 30 January 2015

River Side 1.2

As mentioned in previous posts, we have designed a bridge and nearly all modules have been involved one way or another weather it was surveying costs, third angle orthographic projection of the building or relating our bridge to existing structure. Well bridges connect two places together, we are assigned to design on these two places. Riverside 1.2 project required us to create an extension to the existing guard house, we were given requirements such as primary material being glass and facilities we must include. EU country of my choice was Sweden, as it has a very diverse culture, interesting geographical features in terms of land, urban areas and overall culture.